Gipsy Lane works from 23 August 2013

Notice valid from: 23/08/2013 - 01/09/2013

Expected programme of works from Friday 23 August to Sunday 1 September 2013

What's happening on site

  • The first glazed shop fronts have been fitted to the Colonnade building
  • Paving on the piazza entrance will begin in the next few weeks
  • The granite floor of the Terrace is completed
  • Lighting is active in many areas of the Library and pooled teaching area
  • The lecture theatre and smaller lecture rooms are receiving final fittings
  • Specialist joinery (e.g. counter tops, room dividers) is being installed within the Library
  • The Colonnade's feature corten steel ribbon façade is expected to arrive on site in the near future
  • Scaffold removal throughout the building's interior is revealing the Forum's full scale

See recent images from the construction site at our Twitter image gallery

 

What you need to know

Everybody

  • The change to pedestrian access from Headington Road has been postponed
  • This change is expected to take place in the next two weeks
  • Access to the International Centre, Tonge and Cheney School field will be maintained but provided by a new route
  • Access to the Media Centre will be provided by a dedicated path
  • Access through the central courtyard may occasionally be affected by work at height using crane equipment
  • Vehicle access to campus and the construction site from Headington Road is closed
  • Deliveries to the Print Room, International Centre and Tonge will need to be arranged in advance - please contact spacetothink@brookes.ac.uk for further info 
  • Pedestrian access between Headington Road and Cheney School field remains diverted via the path at the rear of International Centre and Tonge

Gibbs and John Payne

  • Ground work behind Gibbs will continue now into September
  • This work may still cause some noise and vibration disruption to nearby building users
  • There will be a continued increase in HGV traffic using the road from Fuller to Gibbs and John Payne
  • Please take care when using the pedestrian crossing in this area and listen carefully to instructions from construction staff

Buckley and Abercrombie

  • A mobile crane has been erected on the site of the piazza and will create background engine noise throughout the rest of the summer
  • When paving work begins in September, trimming of stone may cause some erratic disruption from hand tool use

Sinclair

  • The remainder of works in this area should be low impact on nearby building users as paving and landscaping is completed

    Tonge

    • The newly paved slope outside Tonge is now expected to open in the first week of September

      International Centre

      • A change of access to the International Centre may take place once the newly paved slope outside Tonge is opened
      • Changes will be advertised in advance, but building access will either be provided by the slope outside Tonge or a temporary path from the direction of the Media Centre
      • Concrete breaking and excavation will continue in the areas in front and to the side of the International Centre
      • This work is expected to cause disruption to building users into September and will be followed by paving works
      • The building entrance has been reduced to a single door but access will be maintained at all times, occasionally managed by construction staff

      Media Centre

      • Access to the Media Centre will change at the beginning of September
      • A dedicated path will provide building access, but no through route to other buildings
      • The ramped staircase leading to the print room shutter doors will also be closed, and any print deliveries will need advance arrangement
      • It is expected that a day of severe disruption to users of the Media Centre will result from programmed concrete breaking in the near future
      • Users will be notified in advance of the schedule for this work when confirmed
      • Concrete breaking will continue between the Media Centre and International Centre and close to the Media Centre entrance
      • Media Centre users will continue to experience noise and vibration disturbance throughout August